Improvement in Reclamation Process of Pelton Runner

dc.contributor.authorPenjor, Tshering
dc.contributor.authorDolma, Rigzin
dc.contributor.authorWangmo, Khandu
dc.contributor.authorNamgyel, Kezang
dc.date.accessioned2021-09-17T15:09:42Z
dc.date.available2021-09-17T15:09:42Z
dc.date.issued2019-03-10
dc.description.abstractBhutan is blessed with enormous potential to harness hydro-energy estimated at 20,000Mega Watts with the hydro power sector generating the highest proportion of revenue to the nation. Peyton being the ideal runner for high head is the most prominent type of runner installed in the operational as well as the upcoming hydro power plants. Reclamation and repair of Peyton runner is gaining greater prominence due to the excessive rate of erosion of the runners. Runner reclamation is a practically proven solution for reviving the eroded and damaged hydraulic profile of runner to its original state at a significantly lower cost to that of a newly manufactured runner.Peyton runner reclamation is a sophisticated process requiring intensive technical know how and expertise to retain the mechanical properties, original dimensions and efficiency of the runner. Peyton runners are generally installed for high-head applications and consequently high pressure. Therefore, quality of repair activities especially welding, grinding and post weld heat treatment are paramount to the efficiency and life cycle of the reclaimed Peyton runner. This paper exclusively concentrates on the reclamation process and the improvements to optimize the reclamation process of Peyton runner. The experiences acquired through various challenges and improvements implemented in each and every process over the period for reclamation of runner by Bhutan Hydro power Services Limited (BHSL) are illustrated.en_US
dc.identifier.urihttps://repo.sltc.ac.lk/handle/1/121
dc.language.isoenen_US
dc.publisherETIC conferenceen_US
dc.subjectreclamationen_US
dc.subjectpelton runner, erosionen_US
dc.titleImprovement in Reclamation Process of Pelton Runneren_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Improvement in Reclamation Process of Pelton Runner.pdf
Size:
175.99 KB
Format:
Adobe Portable Document Format
Description:
Improvement in Reclamation Process of Pelton Runner

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: